This week we hit the 15 hour mark since the engine overhaul and after the oil change and compression check, the shop gave us the OK to resume normal operations. Also during the month of April, the area received many inches of rain and as usual the rivers in the lower valleys flood. Captured this photo during one of the break-in flights.
No comments:
Post a Comment